HomeBusinessBOLLARD SETUP RECOMMENDATIONS

BOLLARD SETUP RECOMMENDATIONS

Delighting in our strong detachable bollards’ full safety and security calls for careful installment. By failing to install your bollards and obstacles effectively, you prevent them from reaching their full potential and shield your residential or commercial property as efficiently as feasible. Discover exactly how to securely install your bollards, along with just how to set up various types of Bollard Installation, below.

SECURITY BOLLARD SETUP DIRECTIONS

It makes it as simple as possible to mount our bollards with these detailed guidelines properly. Use these referral pictures as a sensible aesthetic guide to the perfect Bollard Installation, and your ground sleeves, bollards, and barriers will certainly stay firmly in position.

  1. MARK YOUR INSTALLMENT FACTORS

Initially, mark your setup points. We suggest your bollards be no more than 5 feet apart. Any room larger than this can fail to obstruct the size of smaller-sized lorries.

  1. AUGER GROUND OPENING TO SPEC

After noting your installment factors, use a drill to pierce holes where you want to apply bollards and obstacles. The hole itself will be wider than the bollard or ground sleeve. It would be best to leave an area to mount a rebar reinforcement and fill the location around the bollard or ground sleeve with concrete.

  1. SET CRUSHED ROCK DRAIN BASE

At the end of the hole you drilled, you’ll need to include a layer of gravel that works as a water drainage point for ground sleeves. This prevents rain, snow, mud, and water from building up in the ground sleeves for your detachable bollards.

  1. PREPARE REBAR CAGE TO SPEC & PLACE IT

Next, you’ll wish to prepare a rebar cage to your specifications and position it. A round rebar cage offers reinforcement for the ground sleeve or the bollard you prepare to install– drop it in the hole and also allow it to hinge on top of the gravel.

  1. CONNECT PVC DRAINAGE PIPELINE TO SLEEVE

After that, connect a PVC drainage pipeline to the bottom of your ground sleeve and also area it inside the rebar cage in the hole.

  1. SETTING SLEEVE WITH PVC PIPELINE SO FLUSH WITH SURFACE QUALITY

As soon as the drainage pipe is affixed, you’ll require to place the sleeve properly. If you are mounting ground sleeves for removable bollards, ensure that the surface area of the ground sleeve is flush with the ground’s surface area and level. If you are mounting a surface-installed fixed obstacle, make sure it stands a complete 36 ″ above the surface for the best level of protection.

  1. POUR CONCRETE & ALLOW THE CURE

Next off, fill up the hole with concrete and smooth it level with the ground– if you installed a ground sleeve, wait for the concrete to heal before mounting your bollard.

  1. INSERT BOLLARDS TO SAFEGUARD CENTERS

Once the concrete is leveled with the ground (and completely cured if a ground sleeve is entailed), you can place your bollards to ensure optimum protection for your facilities.

Must Read

FOLLOW US

Related News